Dong Guan Zhuo Wei Air Purification Technology Co., Ltd.
Main Products:Filter, FFU air purification unit, Air shower, Cargo shower
130 Fuhai Road, Xiagang community, Chang’an town, Dongguan
+86-0769-81609661
1. The Performance Features of The Corner Air Shower
1). Internal space unchanged, small area, can save practical area;
2). Motor power consumption is small, the air shower design is to enter the air shower blowing, go out do not blow, infrared photoelectric automatic induction start control blowing, to avoid the air shower no empty blowing, multiple energy saving;
3). Adopt the module design scheme, the equipment structure is reasonable, the company can according to the future production needs, expand the plant can be moved, from the new assembly for use;
4). Low failure rate.The electric lock is where the air shower failure occurs frequently.The air shower chamber adopts advanced technology, close to induction, photoelectric beginning control electric lock, electric lock and lock head are all made of solid stainless steel, durable!increase of service life.Reduce the air shower failure;
5). With beautiful appearance, long life, easy to clean, in line with the principle of dust-free room design.
The Suggestions:
1). In the process of blowing, please raise your hands and rotate the body by 360 degrees to facilitate all-round dust removal;
2). In the air shower room covered with sticky dust pad, it can stick the dust off the feet, clean the effect is better.
2. Product Parameter (Specification) of The Corner Air Shower
The name of the air shower |
||
specifications and models |
ZW-L-1000 |
ZW-L-2000 |
External size W * D * L |
1300*1000*2050 |
1400*2000*2050 |
Air shower size W * D * L |
790*920*19300 |
790*1920*193 |
Jet Wind speed (m/s) |
20-25m/s |
20-25m/s |
Number of nozzles |
6 Only |
12 Only |
Wind shower cycle |
Factory initial setting is 10S: 0-99s (adjustable) |
|
Box main material |
1.2mm thick cold rolled steel sheet, surface electrostatic injection treatment |
|
Door material and quantity |
Stainless steel single door 2, EVA material sealing performance, 5mm strong glass, double door interlock, with a hand, automatic close.All-stainless steel bottom plate, wear-resistant and corrosion-resistant. |
|
Door interlock mode |
When the air shower double door lock, usually double door electronic interlock, can only open one of them |
|
source |
380V, 50Hz, three-phase |
|
See the machine power (w) |
750*1 |
750*2 |
Daylight lamp power (w) |
20*1 |
20*2 |
Applicable number |
1-2 People |
2-4 People |
Optional accessories |
All stainless steel box, stainless steel inner wall, ultraviolet sterilization lamp, static electricity removal device, automatic door device. |
3. The Installation of The Corner Air Shower
When the air shower is installed at the entrance of the clean room, and there should be no gap between the wall board and the clean room. If there is air leakage, please trim with sealant, and please pay attention to the level of equipment installation, otherwise the door opening and durability will be affected.The equipment is divided into base and no base type, base type can be directly adjusted level, with silicone to fill the modification.The base-free type should be fixed with an expansion screw and filled with silicone.Connect the power supply to the terminal R, S, T, E in the junction box above the equipment at the voltage shown in the specification.
4. The Intelligent Voice Characteristics of The Corner Air Shower
■ The corner air shower adopts fully automatic control operation, double door electronic interlock, infrared induction automatic blowing shower, and double doors are locked when blowing shower.
■ Cold plate spray series, adopt multi-layer pickling technology, electrostatic and dust-free spray treatment.
■ Using all stainless steel to make doors, door frames, handles, thickened floor boards, and air shower nozzles as the basic configuration.
■ Using LCD time display, the air shower time is adjustable from 0 to 99s, and the air shower time is displayed.
■ The air supply and shower system with Archimedes spiral design achieves super strong wind speed of 25m/s~30m/s, ensuring that the personnel and goods entering the clean room can achieve the perfect effect of complete dust removal.
■ Using an advanced mute system, the operation is quieter and has less impact on the people who are working.
■ The unique air freshening function system is adopted to completely eliminate the peculiar smell generated in the long-term closed air shower room & air shower channel.
5. The Structural Configuration of The Corner Air Shower
1). Automatic control. The corner air shower system adopts PLC intelligent control means. The LED display on the control panel can correctly display the running state of air shower, the interlock state of double doors, air shower cycle progress and delayed opening state.And equipped with photosensor, one-way channel air shower, from the non-clean area, after closing the infrared induction to the people blow, blow after the entry lock, can only go out of the air shower;
2). Touch the soft key, LED display and set blowing time, the range is 10-99s, blowing time can be adjusted according to the difference in the external environment of the wind shower;
3). Modular structure, corner blower shower box adopts modular design scheme;
4). High performance, high sealing, using imported electronic components, stable and reliable operating performance, advanced noise reduction and silent device system and EVA sealing materials, high sealing performance.
6. The Advantages of The Corner Air Shower
7. The Use of The Corner Air Shower
1). After opening the stainless steel air door and entering the air shower chamber, the air door immediately automatically closes the outer door, infrared (sound control / human body heat) induction, the air shower automatically starts and blows for 15 seconds (the factory has been set).
Note: When the air shower blows, two stainless steel doors cannot be opened at the same time. If forced opening, the electronic lock will be damaged. The two doors of the air shower are under electronic interlocking control.
2). After the air shower room is blowing, push it out and go into the clean and dust-free room.
8. The Application of The Corner Air Shower
9. The Purchase Instructions of The Corner Air Shower
▲ Invoice description
This store price, are not including tax point, invoice need additional tax point, detailed please consult customer service.
▲ Shipping instructions
The goods in our store are large goods, the freight difference in different regions, the goods do not include freight and wooden frame packaging costs.The actual freight according to the product volume, quantity, wooden frame (export wooden box) packaging, receiving address to calculate, before shooting must contact the customer service to calculate the freight!In order not to occur unnecessary misunderstanding, directly take not delivery, need to fill the freight and wooden frame packaging costs before delivery.
▲ Receipt instructions
In order to protect your purchase rights and interests, to provide you with quality service, sign for when logistics personnel package inspection, if found product damage, less, please don't sign for, and timely contact us, we will help you properly quickly solve (such as no inspection sign for, the store will not bear any damage, such as return).
10. The Introduction of The Dong Guan Zhuo Wei Air Purification Technology Co., Ltd.
11. The Maintenance of The Corner Air Shower
1). This equipment must be maintained and kept by professionally trained personnel.
2). Small faults shall be handled by the equipment personnel trained by Party A, and large faults shall be repaired by our personnel on-site
3). Check the primary filter every month. If you notice a layer of dust, you need to change the filter
4). The life of the high-efficiency filter is determined by two factors: the number of times the air shower is used and the maintenance of the initial filter. Generally, the service life of the high-efficiency filter is two years. Regularly measure and record the wind speed. When lower than 10 m/s, the high efficiency filter must be replaced
5). When going in and out, do not force the doors on both sides to open at the same time, so as to avoid the damage of thousands of door locks
6). Do not push the glass with your hands when entering or going out, so as not to hurt people after the glass is broken
7). When entering and leaving the door, you must gently pull the door handle, and do not open the door too far, so as not to cause damage to the door, door lock and door closer
8.). When the air shower system is working, the door shall not be forced to open
12. FAQ:
Q1: What is you minimum order quantities?
A :Our MOQ is one set which can meet your sample requirement.
Q2: What is your leading time.
A :It’s based on your quantities and the sizes of the products.Generally it takes us 20 days for one container and 10 days for sample orders.
Q3: What is your payment terms?
A :30% by T/T as deposit, balance will be payed before delivery.
Q4: Do you accept OEM&ODM?
A: Yes
Q5: Why maxi?
1). 2 years warranty time guarantee
2). 24 hours to give you prompt and further information
3). Send invitation and arrange everything for you when you come to China.
Dong Guan Zhuo Wei Air Purification Technology Co., Ltd. was established in 2009. It is a high-tech company mainly engaged in R&D, manufacturing and sales of clean room purification equipment. The company specializes in the production of various types of air showers, cargo showers, initial, Medium and high-efficiency filters, high-efficiency air outlets, transfer windows, clean workbenches, clean sheds, FFU air purification units and other purification equipment, a complete range, to undertake precision machinery, laboratories, biomedicine, food processing, electronics, circuit boards, optoelectronics , optics, aerospace, circuit boards, cosmetics, purification equipment and supplies supply and installation, debugging, testing and other one-stop services.
We always adhere to the enterprise tenet of "survive by quality, seek market by reputation, seek development by technology, and seek benefit by management", adhering to the business philosophy of "creating first-class quality products and building Huaye's image", and constantly integrating product manufacturing and engineering and The professional and group-based business model integrating design and installation will wholeheartedly provide you with high-efficiency, high-quality, high-rated construction management engineering services, and sincerely create a first-class clean space for you.